| Electrical
System Consisted of 3 GT Generators 2 DG Sets
and 2 feeders from State Electricity grid. The
SCADA system monitors these power sources and
also monitors the loads. A maximum demand measurement
and control scheme implemented in the SCADA software
to minimise MD changes being paid to the State
Electricity Board.
Custmized software program provides guidelines
for load shedding as an early warning system.
Automatic load shedding, though feasible is overridden
considering complexity of the manufacturing process
in a fertiliser plant.
The hardware transducers and RTU's are indegeniously
developed. The SCADA software runs on a Personal
Computer and is connected to RTU through dedicated
copper wire link. |